Wireless Link Projects

This is a new link delivering 635Mbps of bandwidth to Rochester 3A Schools Elementary campus. This increased bandwidth while decreasing cost!

 

This is a 140’ ROHN Tower that we installed and erected at Bloomington-Normal Water Works. This gave them the ability to connect all of their remote sites in and around the Bloomington-Normal area. Our Techs here at Entre Solutions II built this tower from the bottom up!

 

Finished building a 70ft Rohn 25G tower for Oakwood School district, one of our Educational clients. Building the new tower allowed our client to continue to use their existing #Cambium Networks Point-to-Point radios and provides a solid 50Mbps link. Before our Point-to-Point solution, the Junior High campus had 2 T1 lines (6Mbps). Cutting the wire has increased bandwidth and saved them time and money!

 

Here is a great view of Bloomington-Normal water Works tower, built by Entre Solutions.

Leave a Reply

Your email address will not be published.